Skip to main content

Integrating SRS Distribution: An end-to-end guide

Learn how to integrate Roofr with your SRS account, set up your catalog pricing in Roofr, and use integrated pricing in your Roofr proposals.

This integration ensures Roofr automatically syncs with the latest SRS pricing, so you never worry about manually updating prices or sending proposals with outdated material costs.

Prerequisites:

  • A SRS Supply account

  • A Roof Hub account

What you’ll find on this page:


Ordered most of your frequently used items in the last 180 days?


How to Connect your SRS Account with Roofr

1) Enter your credentials

In the Integrations section of your Roofr Dashboard:

  • Click Connect on SRS Distribution

  • Enter your Roof Hub Account number and Integration Key (not your email)

  • Click Connect

💡 Your Roof Hub Account number can be found on your Roof Hub account home page and at the top of your SRS invoice

💡 Your Integration Key can be found in the Integrations section of your Roof Hub account

2) Confirm your Account and Branches

  • Select the account you wish to connect and click Next

  • Choose the branches you want accessible in your integrated pricing and click Confirm

3) Add Branch Contact Information

  • Click Add branch contact on each selected branch

💡 Every branch must have a contact before you can save the supplier. Branch contacts can be found in your previous invoices or in the ‘Locations’ section of your Roof Hub account.

  • Add branch contact name and at least one contact method (phone or email)

  • Click Save


How to Integrate your Roofr Catalog Pricing with SRS

💡Just starting to create your Roofr Catalog? Use Roofr Jumpstart to import a curated list of common items to your Roofr catalog with supplier prices included.

Add and connect a single line item

  • Click Add item

  • Select SRS as your supplier catalog

  • Type the item name or SRS item code in the search bar

  • Roofr will search for a matching item across the entire SRS catalog

  • Choose the correct product from the SRS catalog

  • After selecting the item, Roofr will gather pricing from all branches you’ve set up in your SRS integration

💡 Ensure that SRS is selected as the ‘Source’ in the pre-tax costs column on the line item to view


Connect all the existing items in your catalog:

Use the Roofr connection widget

  • Click Connect remaining items

  • Select SRS in the supplier drop-down

  • Check that each item is connecting to the correct product in the SRS catalog

  • Confirm individually or click Confirm all

  • Click Save


Add items via CSV:

  1. Download the Roofr Catalog CSV template

  • Click Manage Catalog then, Download CSV

  1. Add SRS SKUs

  • Open the CSV file

  • Add the SRS Distribution Item Numbers (SKU) numbers for selected items the column labeled srs_sku

  1. Re-Upload the CSV

  • In your Roofr Catalog, click Manage Catalog then Upload Catalog

  • Select Update existing catalog items

  • Upload your updated CSV file to complete the setup


How to Use SRS Integrated Pricing in your Roofr Proposals

1) Create a Roofr Template

  • Add the integrated items that you would like to use to a Roofr template

    • Learn how to create a Roofr template HERE

  • Click Use Template and select the measurement you would like to use for this proposal

    • Learn more about creating Roofr Proposals on MOBILE or on DESKTOP

💡 You can also add integrated items to an already existing proposal

2) Use Supplier Pricing

  • In the Supplier Settings of your created proposal, select the Supplier catalog and Branch location you want to use for this proposal

  • Click Save

💡Learn how to customize your Roofr proposal on MOBILE or on DESKTOP


How to send a Material Order with SRS pricing

1) Create Material Order

From a Job card with a draft or won proposal using SRS integrated items;

  • Click +Material Order and select the proposal you want to create the order from

  • Click Continue

  • Review your material items and click Continue

2) Edit Material Order

  • Select your branch location from the dropdown menu (if not already selected)

💡When pulling the material order from a proposal with integrated items, the order is locked to that supplier

  • Check Connect to link any remaining items with SRS (if applicable)

  • Edit your material order as needed

💡Learn more about Roofr material orders HERE

3) Send Material Order

  • Click Finalize order

  • Click Place Order to send your request directly to your SRS branch

💡 You will receive a confirmation number when placing the order and via email. You can use this to reference your order in your Roof Hub order history

image.png

💡 Roofr automatically updates order status on the material order and emails the job assignee when suppliers send updates

image (1).png

Did this answer your question?