Overview

The activity manager enables the user to manage and configure their associated limits and other data about their activities . It is the installation limits associated with an activity, that fundamentally enables calculation of activity feasibility.

The activity manager is where the user start the process of storing information about their upcoming activities. This is typically done before the offshore campaign starts. The activity manager is broken down into the following components:

Note, if an activity refers to seastate tables and alpha factors, then these tables must be configured before adding the activity. See linked sections above.


Ensuring Quality Input

The accuracy and reliability of ODST depend on the quality of the input data, particularly the results from installation simulations. It is imperative to follow company best practices and QA/QC routines and adhere to relevant regulatory standards when establishing the operational criteria that defines the foundation of ODST Activities.


Add/Edit Activity

Navigate to the Manager tab in the top menu and click "Add Activity" or click the pencil icon in the activity list. Enter activity information in the prompts and set activity status (v1.3.0):

  • In Planning means that the activity is active and available as a new step in the Planner module

  • Complete means activity is complete and not available as a new step in the Planner module

Note, completed activities are hidden by default in the Activity overview. Toggle the show/hide button to see hidden activities

Set Criteria Types

ODST supports the following activity criteria types (v1.3.0):

  • Wave based

  • Vessel motion based

  • Response based (requires RFT integration)

  • Current based

  • Wind based

When selecting criteria type, the input form will update accordingly. The user will be guided directly in the user interface on how to input data. Tooltips are available for additional guidance (hover your mouse over the information icon)

tooltips icon

Use the "Document/MOC" number prompts to cross-reference simulation results with the specific criteria outlined in relevant analysis reports to ensure alignment.

See also Sea-state tables explained to understand how to use sea-state tables.

Configure Alpha Factors

Select relevant alpha factor table from the dropdown list. If the operation can be halted, select "Yes" and enter time (Tsafe) to reach storm riding condition.

See also alpha-factors explained to understand how to use alpha factors.


Delete Activities

Click the "trash" icon in the activity list to delete activities

Note: Only activities that is not linked to a sequence step in the Planner can be deleted.