Managing a Material Requirements Plan (MRP)

Manage Production Requirements Planning (MRP) in BRAINR to plan materials and production capacity.• MRP calculates required raw materials and schedules production across available lines. • Review MRP results after MPS changes to confirm quantities and timelines.

Important Notes

  • Changes to your Master Production Schedule automatically update the Material Requirements Plan, no manual refresh needed.

  • Always review your MRP after MPS edits to confirm all production targets, quantities, and timelines flow through correctly.


Accessing the Material Requirements Plan module

  1. From the Homepage, go to the "Production Requirements Plan (MRP)" module located in the Production Planning section.

  2. In this view, you'll find a list of all existing MRPs in one of the following statuses:

    • Draft

    • Open

    • Calculated


Managing MRPs in Bulk

You can cancel or close multiple MRPs at once using the bulk action feature:

  1. Multi-select the desired MRP records from the list.

  2. Click the Actions button located in the table header.

  3. Choose Cancel or Close as available.

Note:


Managing Individual MRPs

Each MRP can be managed individually:

  1. Locate the desired MRP in the list.

  2. Click the three-dot menu at the end of its row.

Choose from the available actions:

  • Details – View MRP details.

  • Edit – Modify MRP data (products, dates, quantities).

  • Cancel – Cancel the selected plan.

  • Close – Close the plan (Calculated only).

  • Add Note – Document observations about the plan.


MRP Details View

Review every detail of your Material Requirements Plan and make production adjustments.

  1. In the MRP list, click any MRP row or click the three-dot menu at the end of the row and select Details.

This opens the complete MRP Details page with seven tabs across the top, organizing all production planning information into clear sections for easy review and management.


Overview Tab

The Gantt view displays product line allocations across all production lines.

It shows exactly what products will be produced, on which lines, how long production runs on each line, plus exact start and end times for each scheduled block.


Details Tab

This tab displays general MRP details including the plan description, start date, end date, and other essential data about the production plan.


Items Tab

This tab mirrors the exact list of products entered during MRP creation or editing.


Results Tab

This tab shows all requirements needed to execute the MRP, specifically what raw materials, components, and quantities are required to produce your target products.

Example: When planning to produce Chicken without giblets > 18 granel fresh, the raw materials list displays Live industrial chicken along with the exact quantity needed to meet production targets.

View requirement breakdown

  • Link appears only if this product is consumed by other products

  • No link for products intended only for self-production (final products)

  1. Click the quantity link next to the product when available (e.g., Chicken without giblets > 18 granel fresh).

  2. See detailed breakdown showing exactly which products consume this material and how much.

Generate orders from this view

  1. Multi-select main products.

  2. Choose Generate Orders, Generate Orders by Partner, or Change Production Line/Shift.

Manage table results

  1. Click "Manage Results" in the table header.

    • Opens a dedicated page showing all products where you can modify quantities to produce for each displayed product

Restriction:

Individual row management

  1. Click the three-dot menu on any row, then select "Manage Results" to open a modal.

    What you can edit depends on product type and order status:

    • Co-products:

      • Order generated: No changes possible

      • No order generated: Change quantity to produce

    • Main products:

      • Order generated: Quantity read-only, but can still edit production version, production line, shift

      • No order generated: Edit production version, production line, shift, quantity to produce


Line Allocation Tab

Shows each line's capacity (quantity/hour, weight/hour) vs. planned production (quantity, weight).

Displays occupation percentage to confirm lines stay under 100% utilization.

Reorder production per line

  1. Click a specific production line.

  2. Drag products up/down to change sequence.

  3. Edit quantities, add notes, or multi-select main products to generate orders.

  4. Click Save to apply changes


Product List Tab

Displays tree view of all products from MRP creation.

Each line shows:

  • Product name and code

  • Product type: main product, component, or neither

  • Quantity to produce

  • Technical list followed

Expand products to see requirements

  1. Click expand icon next to any product.

Example: Chicken without giblets > 18 granel fresh *expands to show Live industrial chicken* plus the exact quantity needed for parent product.


Stock Analysis Tab

This tab provides a complete stock overview for all products in the MRP, showing supply and demand between the MRP start and end dates.

Each row displays:

  • Stock Quantity: Current physical stock available in warehouse

  • Qty. for Sales Orders: Quantity from existing sales orders within MRP dates (click to see associated documents)

  • Qty. for Purchase Orders: Quantity from existing purchase orders arriving within MRP dates (click to see associated documents)

  • Qty. to Produce: Quantity from existing production orders within MRP dates (click to see associated documents)

  • Qty. to Consume: Quantity from existing consumption documents within MRP dates (click to see associated documents)

  • Qty. for Virtual Stock: Calculated virtual stock (Stock Quantity - Sales Orders + Purchase Orders + Qty. to Produce - Qty. to Consume)