In this article, we'll be looking at what all the different statuses mean and what action triggers what status.
Delivery Milestones
'Ready for Pickup to Finished'
(Right-click on the flow chart and open a new tab to get a better view)
Allocation Procedure
'Transport Order Creation' to 'Ready For Pickup'
(Right-click on the flow chart and open a new tab to get a better view)
Draft
When you as user create a new TO and save it, the order goes to Draft. It is in the system, but no allocation, confirmation, or activation has been completed yet.
A Draft TO that is still linked only to a cancelled Sales Order in Draft can be deleted instead of cancelled. There is no way to recover a deleted order. See Canceling an order.
Pending Allocation
When a carrier is assigned via carrier allocation settings, the order can move to Pending Allocation if that option is enabled on the allocation rule.
This means the carrier is allocated on the TO, but the carrier has not been informed yet. Carrier-facing emails are blocked until you as user release the allocation.
Next step: Release Allocation (single TO or batch).
After release:
If the carrier follows the confirmation flow, the status becomes Pending Confirmation.
If confirmation is not used and the order can activate, it can move toward Ready for Pickup (depending on TO settings, including whether a rate is required).
These options are in Transport Order Settings and on the Carrier Allocation rule (Pending allocation checkbox).
Pending Confirmation
The carrier must accept or reject the order before the next status.
Carrier accepts → typically Ready for Pickup (or Confirmed (Missing Rate) if a rate is still required and missing).
Carrier rejects → Incomplete.
Carrier flow (confirmation, pre-advise, or both) is configured in Transport Order Settings. For the carrier email, the relevant option must also be enabled in E-mail Contact Settings.
Incomplete
Incomplete means no carrier has been allocated on the TO yet. The order is waiting for a carrier (or for allocation to succeed).
Why a TO becomes or stays Incomplete
No carrier assigned yet
You as user have not assigned a carrier, or the order was created without one.No matching carrier allocation rule
There is no carrier allocation setting for this order (division, lane, service level, and other rule filters).Allocation ran, but failed
A rule exists (for example Cheapest carrier), but Control Tower could not select a carrier. The most common cause is that TO data does not match rate / allocation settings:Origin / destination (country, zip, region) does not fall in the rate zone lanes
Transport mode, service level, currency, or vehicle type on the TO does not match the rate zone
Weight, pallets/parcels, distance, loading metres, or volume is missing or outside the rate lines
Billing date is outside rate validity, or office-hours flags do not match
Hazardous / waste flags on the TO do not match the rate zone
For ocean, ports or routing on the TO do not match the rate set-up (for example Place of Receipt / Place of Delivery vs Port of Loading / Port of Discharge)
When backup carriers are exhausted, the system can fire an Allocation failed alert. The TO stays Incomplete until a carrier can be assigned.
Carrier rejected
The carrier rejected the confirmation email / Partner Portal confirmation, or rejected the pre-advise. Status returns to Incomplete and the carrier is no longer allocated.Carrier removed in Control Tower
You as user (or another Control Tower user) rejected the allocation or removed the carrier.
How to move an Incomplete TO forward
Assign a carrier manually on the TO form.
Use Rate Explorer on an Incomplete order (order without a carrier): select a matching rate card and Select carrier. The system applies the carrier and the rate.
Correct the TO data or the master data so allocation can match (lane, mode, service level, units, ports, and so on), then recalculate / let allocation run again.
If a carrier is assigned but the rate still does not apply, the status becomes Confirmed (Missing Rate).
Confirmed (Missing Rate)
A carrier is on the TO, but there is no freight or spot rate yet.
This is the status to use when investigating “the order has a carrier but it will not activate because of rates”. Typical causes:
Apply Purchase Rates is off on the TO form
A rate zone exists, but TO values do not match it (same checklist as Incomplete allocation failures)
A spot / manual rate was expected but not added
If you as customer want TOs to activate without a rate, enable the corresponding option in Transport Order Settings (the checkbox shown on the original article screenshot).
Until a rate is present (or that setting allows activation without a rate), the TO cannot follow the normal activation path.
Rate requested / Rate provided
These are rate-negotiation statuses before activation (for example while a quote / price analysis is in progress).
Rate requested — a rate has been asked for; the TO is not yet activated.
Rate provided — a carrier / price has been selected on the TO, still before activation.
If the linked Sales Order is cancelled while the TO is in Rate requested or Rate provided, the TO is set to Cancelled before Activation and kept (with rate data), instead of being deleted.
Draft TOs linked to a cancelled Sales Order are still deleted.
Cancelled Before Activation
When a TO is cancelled before it is activated (orange statuses), it gets Cancelled Before Activation. Depending on TO settings, you as user may have to provide a reason.
Cancellation surcharges can be applied automatically from the cancellation surcharge settings, if matching costs already exist on the order. See Cancellation Surcharges and Canceling an order.
Cancelled orders can still be moved through Ready for Reporting and Ready for Billing so the billing flow can be completed.
Cancelled Before Activation (Billing Sent)
Billing Sent: a prebill of the costs has been sent to the carrier for them to approve or reject.
Billing Approved: The carrier accepts the prebill
Billing Rejected: The carrier rejects the prebill
Billing Complete: When you put the order on ready for billing
Pre-advise Sent/Confirmed
Use pre-advise when the shipment is planned but goods are not yet physically ready for pickup. The carrier gets early visibility; the TO stays inactive until you as user activate it.
Configure the carrier flow in Admin > Settings > Transport Order Settings (Order Logic):
Pre-advise — pre-advise is sent on save; carrier accepts or rejects.
Either — pre-advise first; if there is no response, confirmation flow is used. If the carrier accepts the pre-advise, confirmation is skipped.
Both — pre-advise, then confirmation as well.
Process:
Pre-advise is sent → Pre-advise Sent.
Carrier accepts → Pre-advise Confirmed. Material Orders can remain Draft, depending on Material Order settings.
Carrier rejects → Incomplete.
To move to Ready for Pickup, activate the TO on the TO grid (or via Material Order activation if that option is enabled).
Full set-up: Pre-advise flow.
Ready For Pickup
The order is activated automatically or manually:
Right-click the TO → Order Flow → Activate Order
A TO cannot be activated without a carrier.
If a rate is required and missing, the TO stays in Confirmed (Missing Rate) until a rate is applied or the “activate without a rate” setting is enabled.
Changes Pending
After activation, you as user can send TO changes to the carrier: Right-click → Send Transport Order changes (Control Tower Role: Transport Orders → Send TO changes).
If With Confirmation is enabled:
Status becomes Changes Pending.
The email includes Accept / Reject.
Carrier accepts → the TO returns to its previous execution status.
Carrier rejects → Changes Rejected. The order can still be completed.
To leave Changes Rejected / pending changes: Right-click → Order Flow → Cancel pending changes.
Draft-order changes are included in the original confirmation / assign emails; Send TO changes applies to activated orders.
Details: Send Transport Order changes.
(Right-click on the flow chart and open in a new tab to get a better view)
In Transit
When the collection arrive actual is updated, the TO goes to In Transit.
The order stays In Transit until the destination arrive actual is updated (unless Force Finish or a cancel applies).
Actuals can be added once the transport is in Ready for Pickup or later. Once an actual date is added, the scheduled date for that milestone can no longer be changed.
Destination
When the destination arrive actual is updated but the collection actual is not, the status changes to Destination.
Finished
The collection and delivery milestones were updated.
A Transport Order can be finished by the logic of the required Milestones of Control Tower or manually by the user.
In some cases not all relevant Milestones are provided by the carrier, to finish such orders you can automate the Finish process by certain rules.
How to configure
How to configure
You can configure automation in the Transport Order Settings using the new “Force Finished” option.
Time-Based Automation Scenario
You can define a rule that automatically finishes a Transport Order 2 days after the last scheduled date has passed.
This helps ensure that transport does not remain open due to missing actual milestone timestamps.
The system logic works as follows:
The automation always checks the last stop scheduled date within the Transport Order.
If multiple milestones or stops exist (e.g., Collection → Scheduled Routing → Deliver), the system will:
Look first for the last milestone (typically Deliver) with a scheduled date.
All milestones without an actual timestamp will kept without Actual as there had been no Actual provided
The rule applies only to Transport Orders that are already in “In Transit” status, ensuring that automation is triggered only for active, ongoing shipments.
If a user later removes the last actual milestone from a “Finished (Forced)” transport, the system will automatically move the transport back to “In Transit”, and during the next scheduled check, it will again set the transport to “Finished (Forced)” if the same rule conditions are met.
Alternatively you can enable the check box to consider also Orders which are not in the Status "In Transit" and stuck in "Ready for Pickup".
Configurable Milestones for Force Finish
You can define Milestones which should be considered for the Transport Order to be forced finished.
For example you required different Milestones Actuals to be provided for your Road Transport Orders compared to your Ocean Transport Orders.
Other cancellation statuses during execution
Status | When it is used |
Cancelled Before Collection | Cancelled after activation (green status) but before collection (for example Ready for Pickup). |
Cancelled In Transit | Cancelled after activation and after it has been collected (for example In Transit). |
Cancelled: Order Merged | Only for Transport Orders. Status of TOs that were not the target of a Merge action. |
Cancelled orders show red milestones. Cancelling a TO does not cancel the Material Orders on it; those MOs become available to reassign. Full cascade rules: Canceling an order.
Billing
(Right-click on the flow chart and open a new tab to get a better view)
When the TO is Finished, the billing flow starts. There are two options as customer:
Option A — Pre-bill:
A system-generated pre-bill is sent to the carrier to approve or reject.
Preconditions (see Pre-bill):
TO status is Finished
Billing status is empty or Rejected
A contact exists in contacts master data
Reroute Purchase Order is de-activated
Status | Meaning |
Billing Sent | Pre-bill sent; costs are frozen. |
Billing Approved | Carrier (or a user with Accept/Reject Pre-bill) accepts. Costs become unavailable. The system then tries to set Ready for Billing. |
Billing Rejected | Pre-bill rejected; costs are available again. |
These billing statuses are not a type of cancellation. A cancelled TO can still enter billing if you set it Ready for Billing / Ready for Reporting.
Option B — No pre-bill:
If you do not use pre-bills, a Control Tower user sets the order Ready for Billing. Status becomes Billing Completed.
In Transport Order Settings you can enable Force Ready for Billing and define when a TO is put to Ready for Billing automatically. Force RfB starts once the order has reached Finished.
Charges can be changed until Ready for Billing is reached or the pre-bill has been sent. Pending costs are not included in that logic.
Ready for Reporting
Ready for Reporting is the last step before Completed.
Manual: Right-click the TO → Order Flow → Ready for Reporting
Automatic: TO setting to automate Ready for Reporting (keep the existing screenshot)
An order is Completed when it is Finished and the billing flow (including Ready for Reporting, when you use it) has been completed.
Cancelled orders can also be set to Ready for Reporting and Ready for Billing so they still run through billing.