Skip to main content

Change a product, rate or date across paddocks

Edit an activity on several paddocks at once, replace or remove a product everywhere, or shift dates.

P
Written by Phase Team

In Crop Plan Studio (the Plan page) you can change a planned activity on many paddocks at once: its rate, a product, its date or its notes. You can also swap one product for another wherever it is planned this season, or move a whole program earlier or later. Use this when most paddocks share a program and something about it has changed.

Before you start

  • Open Crop Plan Studio: on a computer, select Plan in the top navigation; on a phone, select More → Paddocks & crops → Crop Plan Studio. Check the season name in the top bar.

  • You need permission to edit crop plans. People who can only view plans can open activities and look a product up in Find a product…, but can't change anything.

  • Passes already marked done never change from here. To correct finished work, see Fix what was applied, or reopen a finished job.

Select several paddocks

A plain tap selects one paddock. To select more:

  1. Turn on Select (the pointer icon) in the top bar. On a computer you can also hold Shift and click.

  2. Tap each paddock, or tap a crop in the map legend to add all of that crop. Tap a paddock again to take it out.

  3. Press Done.

The same planned job on the selected paddocks shows as one activity card. If one paddock needs a different rate, product or timing, leave it out of the selection and change it on its own afterwards.

Change a rate, price, date or detail on the selected paddocks

  1. Tap the pass in the paddock sheet to open it. The name is at the top, with the cost per hectare, the hectares and the paddock count under it. The facts are grey pills with a pencil: When, Area on a spray, spread or other application, and Crop and Sowing rate on a seeding pass. Under them is the operator's panel: Water (sprays), Droplet, Nozzle and Note, with More details for the commitment, method, pressure, speed, target, row spacing and harvest fields. An empty row says Add.

  2. Tap what you need to change. Its box opens under the row. A product's rate and unit change in place; its price is under the row's ••• → Change the price…. As soon as you change a product's rate, unit or price, or a machine's or cost's figures, Not saved yet appears under that row with Cancel and Save.

  3. Press Save under the row to save that line alone. Cancel puts that line back and keeps anything else you typed.

  4. Or press Save changes at the foot of the pass to save everything at once. The name, date, water rate, note and other details have no Save of their own: they save with Save changes, which stays in view at the bottom of the panel.

With one paddock selected, the change applies as soon as you save it. If the same pass is planned on other paddocks too, the message says so and offers, for example, Apply to the other 4 too. With several paddocks selected, Phase writes the change to every selected paddock that has that pass. Either way the message offers Undo, and your selection stays so you can make the next change straight away.

Where should this change go? With several paddocks selected, and the same pass also planned on paddocks you didn't select, Phase asks first. Choose The 3 selected paddocks or Every paddock with this pass; each names the paddocks and their hectares. Check the cost change and any paddocks listed as skipped, then press the button that says the answer, such as Apply to 3 paddocks. Cancel leaves the plan alone.

Changing the date. Changing the date under When drops an old end date, so the pass is planned for the new day only. To move many passes by the same number of days, use Shift dates… (below).

Swap one product for another on the selected paddocks

For example, glyphosate to paraquat on the summer spray of six paddocks:

  1. Select the paddocks and open the pass.

  2. On the product's row, tap •••.

  3. Choose Replace with another product….

  4. Pick the new product and check its rate.

  5. Press Replace product.

Phase replaces it on the selected paddocks with that pass and offers Undo. Replacing the seed on a seeding pass changes the variety to the new seed's (a variety you typed yourself, which the seed never named, is left alone).

A pass with a zone prescription for that product is left as it is, and the preview says to change it in Spatial. The same ••• on the row also has Vary by zone in Spatial…. See Set rates and export a prescription.

Take a product, machine or cost off a pass

  1. Open the pass.

  2. For a product, tap the ••• on its row and choose Remove from this activity. The item turns into Keep and Remove. For a machine or cost, tap the ✕ on its row. A small red Remove appears beside it.

  3. Tap Remove.

It comes off straight away, with an undo in the corner, and the pass stays open for the next one. Keep, or the ✕ again, leaves it on. Taking the seed off a seeding pass takes its variety off too.

Add or reorder inputs

  • Add product, Add machine and Add cost under the products add a line. A seeding pass also has Add seed. A product you have planned before goes on at its last rate, and a machine or cost at its last figures; all stay editable on the pass.

  • Machines show their running cost and diesel. Costs such as cartage, fees and hire show their kind. A cost charged per tonne shows its $/t, and its $/ha follows the pass. See Add notes, machines and other costs to a job.

  • Drag the ⋮⋮ grip at the left of a product to move it up or down the mix. With a keyboard, focus the grip and use the up and down arrow keys.

  • At the end of the add buttons are the pass's $/ha, the spend over the selected paddocks, and the N, P, K and S it puts on.

Change, replace or remove a product everywhere it's planned

Use Find a product… when one product needs changing across the whole season, whatever is selected.

  1. Open Actions in the top bar (the ••• button on a phone) and choose Find a product…. It lists every product on passes still to do this season. Search by name if the list is long.

  2. Pick the product. You see its paddocks and hectares, and every pass that holds it with date, rate and $/ha. Every pass that can be changed starts ticked.

  3. Untick any pass to leave alone.

  4. Choose what to do with the ticked passes:

    • Replace with… another product, setting its rate and price in the same step, then Preview replace.

    • Change rate: Set to a new rate, or Change by % (for example -10 takes a tenth off), then Preview.

    • Remove it from those passes.

  5. Check the preview bar, then press Apply to N paddocks.

Each is one change with Undo. Select these paddocks picks that product's paddocks on the map.

Done passes are never changed. Passes with recorded work or a zone prescription linked to them are listed but left as they are, with the reason. If the ticked passes use different rate units (mL/ha and L/ha, say), Set to isn't available: use Change by %.

Move a whole program earlier or later

  1. Select the paddocks.

  2. Open Plan tools, the ••• at the top of the paddock sheet.

  3. Choose Shift dates….

  4. Type the number of Days (1 to 366) and choose Earlier or Later.

  5. Press Preview changes, check the preview, then press Apply to N paddocks.

Every dated pass still to do on those paddocks moves by that many days, with its date window. Undated and done passes don't move. The move has Undo and shows in Change history.

The preview shows each pass in the plan's own dates, for example "Summer knockdown: 14 Apr – 28 Apr → 21 Apr – 5 May · 1 paddock". Change history and Phase Agent use the same words. Moves saved before 15 October 2026 keep their older wording in Change history.

The pass's ••• menu

The ••• in a pass's header holds, in the same order on the Studio and on a paddock's Plan tab:

  • Evidence for this decision, with one paddock selected. It opens as a sheet: see Planning notes, change history and what-if checks.

  • Edit what was applied, on a finished pass on the Plan tab.

  • Copy this pass to paddocks…, then tap the paddocks on the map. A paddock that already has the pass is left out and named.

  • Copy to Wheat paddocks missing it · 3 (named for the crop, with how many lack the pass).

  • Vary by zone in Spatial…, for a product that can be put on by zone.

  • Save as template. See Save and apply plan templates.

  • Remove from N paddocks, which takes the whole pass off the selected paddocks after the preview.

Assign to someone (Change who does it once someone has it) is a button at the foot of the open pass, beside Mark done. See Give a planned pass to someone as a job.

Good to know

  • Check the unit before the number. Going from mL/ha to L/ha is a 1,000 times change, not a new number. Check the product is the right one too.

  • Check the total. Look at the new total and estimated cost in the preview or beside the pass's add buttons. If it looks far too big or small, undo it and check the paddock area, rate and unit. Then spot-check one normal paddock and any exception paddock.

  • Stock needs follow the plan. Check the new requirement in Actions → Inputs, or Inventory → Chemicals, Fertiliser or Seed → Demand. See Check what the plan needs against your stock.

  • The same pass twice on a paddock. A split program, such as two urea top-dresses, shows each pass on its own card, earlier one first, each with its own date. A change on one card changes that pass only. With several paddocks selected, the first top-dress on each paddock shares a card, and so does the second. Every paddock with this pass still reaches the same pass on every other paddock that has it.

  • Order. Dated passes sort by date. Passes with no date, or sharing a date, get a ⋮⋮ grip so you can put them in the order they're done.

  • Other ways in. One paddock's Plan tab on the map shows the same pass card. After you save a change there, Phase can offer Apply edits to matching activities? for the same pass on other paddocks. See Change one paddock's plan on its Plan tab. You can also type the change into the Studio's Agent and check what it proposes. See Ask Agent in Crop Plan Studio to change the plan.

If something doesn't look right

  • Tapping only selects one paddock. Turn on Select in the top bar first, or hold Shift and click. If there is no Select button, contact Phase support.

  • Fewer paddocks changed than expected. Only selected paddocks with the same pass change. Check the count in the top bar. To take it further, use Apply to the other N too on the message, or choose Every paddock with this pass when Phase asks Where should this change go?.

  • I can't find Selection or All with this activity. Since 6 November 2026 those pills are gone: the same two choices read as cards with the paddocks' names and hectares.

  • A product wasn't replaced on some passes. Those passes are done, or have recorded work or a zone prescription linked. The reason shows in Find a product… and the preview.

  • Save is greyed out. A price question on that line needs an answer first, such as a price over $1,000 a hectare. See Prices, costs and gross margin in the crop plan.

  • Shift dates… is greyed out. None of the selected paddocks has a dated pass still to do.

  • I changed the wrong thing. Press Undo in the top bar, or use Actions → Change history → Undo this change.

Related

Did this answer your question?