Skip to main content

Give a planned pass to someone as a job

Assign a planned spray, spread or seeding to one or more people so it lands on their jobs list.

P
Written by Phase Team

A spray, spread, seeding or any other pass in the crop plan can be given to one or more people as a job, from Crop Plan Studio or from a paddock's Plan tab on the map. It lands on the notice board, under For me for each of them, with the paddocks, products and rates from the plan, and they mark it done from there.

To set up a spraying job with chemical rates over several paddocks, plan the pass in Crop Plan Studio and assign it, rather than posting it on the notice board. A job posted on the board, or started with New work, isn't tied to the pass: finishing it doesn't mark the pass done, record what was applied or take products off stock.

Before you start

  • Owners, co-owners and admins can give out a pass. Staff can too when their access lets them edit both the crop plan and the farm, which it does unless someone has turned it off. Advisers and view-only logins don't see Assign to someone.

  • The person doing the job needs to be able to record work to mark it done. Owners, co-owners, admins and staff always can. If you tick someone who can't, Phase says they can see the job but can't mark passes done.

  • The pass must be in the crop plan, with at least one paddock not done yet.

Give a planned pass to someone

  1. Open Crop Plan Studio. On a computer select Plan. On a phone open More → Paddocks & crops → Crop Plan Studio.

  2. Select the paddocks the job should cover. For several, turn on Select in the top bar (or Shift-click on a computer), tap each paddock, then select Done.

  3. Tap the pass to open it. Under its name it says what it covers, for example "240 ha · 3 paddocks".

  4. Open the pass's ••• menu and select Assign to someone….

  5. Choose People and tick who will do it, or choose Everyone.

  6. Add a note if you like under Note for them (optional), for example "Use the 24 m boom, start on the north side."

  7. Select Assign. Phase confirms, for example "Post-em spray is on the notice board for Jack Wilson.", and the card now says "Assigned to Jack Wilson".

It makes one job covering every paddock the pass shows that isn't done yet, not one job per paddock. To give out only some paddocks, select only those before you open the pass. Everyone means everyone on the farm sees the job, including people who join later.

Assign a pass as you add it

  1. In Crop Plan Studio, select the paddocks and select Add.

  2. Fill in the pass as usual and select Save pass.

  3. On the message that follows, for example "Knockdown saved on 3 paddocks", select Assign to someone.

  4. Tick who will do it, or choose Everyone, and select Assign.

A pass can be saved with nothing on it and given out straight away, then filled in later.

Give a pass out from a paddock's Plan tab

The paddock's Plan tab on the map uses the same sheet, for that one paddock.

  1. Open Map, tap the paddock, then tap Plan.

  2. On a pass that isn't done, open its ••• menu and select Assign to someone….

  3. Tick who will do it, or choose Everyone, add a note if you like, and select Assign. The pass now says "Assigned to Jack Wilson" under its name.

To give out a new pass as you add it on the Plan tab, choose who under Assign to (optional) on the check at the end of Add. If Phase says the pass was added but not given out, open it and select Assign to someone. Once a pass is given out, the button reads Change who does it. A Studio job over several paddocks shows the same line on each paddock's Plan tab, and changing it from one paddock changes the whole job.

Change who has it, or take it off the jobs list

  1. Open the pass in Crop Plan Studio, or on the paddock's Plan tab.

  2. Open its ••• menu and select Change who does it….

  3. Change who is ticked or the note, then select Save.

To take the job off everyone's list, select Remove from jobs in the same sheet and confirm. The job leaves the notice board for everyone it was given to. The plan doesn't change.

If the pass's paddocks are on more than one job, it says, for example, "Assigned in 2 jobs". Saving in the sheet puts them all on one job.

What the job shows

The job is named after the pass. The people it was given to get the usual new job notification, for example "New job from Mick: Post-em spray". On the notice board it carries a Plan pass tag.

Open it and it is laid out like the pass on the paddock's Plan tab, tagged From the crop plan:

  • The heading: the kind of work ("Spray from the crop plan"), the dates, the hectares (such as "120 ha left of 240 ha"), how it goes on and how many paddocks are done.

  • A map of its paddocks, each outlined and named. Done paddocks are dashed, and open pins show as numbered yellow dots.

  • Water: the rate and the total water for the paddocks still to do, and the machine if the plan has one.

  • Products, each with its rate and Need: how much to load for the paddocks still to do. A rate changed in Studio shows straight away. Prices and costs are never shown.

  • Pins on these paddocks, numbered to match the map, with who dropped each and when.

  • Paddocks, each To do, or Done with the day, and a Map link. A spot spray reads, for example, "30% of North 1, 42 ha".

  • Notes last: the spray Target, the planner's note (On the plan), and every note on the pass's paddocks.

Someone whose access doesn't include the crop plan sees the job but not the paddocks and products. The job asks them to check with a manager what to apply.

Mark the job done

  1. Open the Notice board (More → Daily work → Notice board) and find the job under For me or Everyone. Filter → Kind of work → Crop plan passes lists only these.

  2. Tap the job to open it, then select Mark done at the bottom of its sheet. The same Mark done card as the plan sheet opens, one question at a time.

  3. Check the day the work was done, the paddock and area done, and the amounts used.

  4. Select Mark done on the check.

  5. If Mark same job on other fields? opens, only the job's other paddocks are ticked. Untick any not done yet, then select Mark 2 other fields done (the number changes).

The spray record and the stock use are saved exactly as if the pass was marked done in Crop Plan Studio. The job finishes by itself when its last paddock is done, dated the day that work was done, and owners, admins and whoever gave it out get the usual job done notification. For the full form, see Mark work as done.

Without access to record work, the job says "Marking it done needs access to record work. Ask a manager."

How the job follows the plan

  • A paddock marked done in Crop Plan Studio, on the paddock's Plan tab, in John Deere Reconcile or by Phase Agent is ticked off the job too.

  • Reopening the pass reopens the job.

  • Moving the pass's dates moves the job.

  • Deleting the pass takes its paddock off the job. If no paddocks are left, the job goes.

  • A crop plan job has no Complete task section, Mark complete, Reopen or Parts and fluids. To undo a finished paddock, reopen the pass in the crop plan: see Fix what was applied, or reopen a finished job.

  • Copying the pass to other paddocks, carrying the plan forward or saving it as a template never copies who it was given to.

Turn an agronomist's recommendation into a job

  1. Add the recommendation to the plan: Overview → Recommendations → open it → Add to crop plan.

  2. In Crop Plan Studio, select its paddocks and open the pass. A pass added from a recommendation is named "Reco ·" followed by its title, unless it replaced a pass you had already planned.

  3. Select Assign to someone and give it out as above.

Marking the job done also completes the recommendation. See Write, send and act on recommendations.

If something doesn't look right

  • There's no Assign to someone. Since 8 November 2026 it is in the pass's ••• menu (Assign to someone…), on both the Studio and the Plan tab, not at the foot of the pass. Check that nothing on the pass is waiting to be saved, and at least one of its paddocks isn't done. Advisers, view-only logins and people without access to edit both the crop plan and the farm don't get it.

  • The job isn't in someone's list. Open the pass and check who it says it is assigned to. For me on the notice board shows jobs given to you; a pass you gave someone else is under Everyone on yours.

  • They can see the job but can't finish it. Their login can't record work. Owners, co-owners, admins and staff always can; advisers can't. See Change someone's role and what they can see.

  • The job shows no products. That person's access doesn't include the crop plan.

  • You wanted one job per paddock. Select one paddock at a time and assign each.

  • The job isn't marked done after John Deere work came in. The paddock is ticked off once the John Deere job is confirmed in Reconcile.

  • Someone marked it done, then the John Deere job came in. Confirming the John Deere job replaces their record if it covered the whole pass, even on another day, so it isn't recorded twice. See Confirm, undo or ignore a John Deere job.

Related

Did this answer your question?