Why This Matters
The roofing design tool helps you create accurate roof layouts without leaving SubcontractorHub. Master it and you'll build professional proposals faster than ever.
What You'll Need
Admin access to SubcontractorHub
A web browser (Chrome or Edge recommended)
Step-by-Step Instructions
Step 1
Step 1: Understanding Design Modes In The Ai Assisted Roofing Design Tool
Step 2
Step 2: Understanding Design Modes In The Ai Assisted Roofing Design Tool
Step 3
Step 3: Understanding Design Modes In The Ai Assisted Roofing Design Tool
Step 4
Step 4: Understanding Design Modes In The Ai Assisted Roofing Design Tool
Step 5
Step 5: Understanding Design Modes In The Ai Assisted Roofing Design Tool
Step 6
Step 6: Understanding Design Modes In The Ai Assisted Roofing Design Tool
Pro Tips
💡 Roofing tip: Double-check your material quantities before ordering — measure twice, order once.
📋 Stay organized: Keep your roofing customer records up to date for faster proposals.
🔄 Automate when possible: Pair this feature with automations to reduce manual work.
Troubleshooting
Problem | Solution |
I don't see this option | Make sure you have Admin access. Some features require specific permissions. |
Changes aren't saving | Try refreshing your browser and make sure you clicked Save before navigating away. |
Something looks different from the screenshots | SubcontractorHub updates regularly. The feature works the same way — the layout may just look slightly different. |
Materials not showing | Check that materials are properly set up in your roofing database with pricing enabled. |
Last updated: 2026-05-15 · Source: Understanding Design Modes In The Ai Assisted Roofing Design Tool





