Calculate Cut & Fill

Measure and balance the earthworks for your pads and ramps

Written by Holly Conrad Smith

Moving earth is one of the biggest costs on a sloping site. The Terrain app measures the cut and fill for every building pad and ramp as you draw, so you can test levels and see how the earthworks change before you price them.

See your cut and fill

  1. Open the Terrain app and click 3D.

  2. Read the Results group. It shows the site's lowest and highest points and a row of volumes for each pad and ramp.

Lowest and highest point

Lowest point and Highest point in the Terrain app show the lowest and highest ground on your site after cut and fill. When pads or ramps move one of them by 0.1 m or more, a colored number beside it shows how far, such as "+1.2". Hover over that number to see the level before cut and fill.

Read the Volumes table

The Volumes table in the Terrain app has a row for each pad and ramp. Volumes show in cubic meters or cubic feet, following your project's units.

  • Feature: the pad's or ramp's usage, or Pad or Ramp. Its level shows beside the name. A ramp shows its start and end levels, such as "42.0 → 45.5 m".

  • Cut: the earth dug out.

  • Fill: the earth added.

  • Net: fill minus cut. A positive net means you need to bring earth in. A negative net means you have earth left over.

The Total row adds up every pad and ramp. Hover over a row to highlight its pad or ramp on the map. Click a row to select it, or click the checkbox at the top to select them all.

Pad Right Click Menu

For additional options, Right-click the pad's row in the Volumes table.

Set a pad's level

Right click a row and choose Set level. Type the level in the modal and click Set level.

For a ramp, the level is its start level. To give several pads the same level, select their rows first, then right-click one of them.

Balance cut and fill

Balancing makes the earth you dig out match the earth you add, so you don't need to truck earth on or off the site.

  1. Select the rows of the pads and ramps you want to move. To move one, skip this step.

  2. Right-click one of the rows and point to Balance levels.

  3. Choose For this pad or For these pads to balance their own cut and fill. Choose For the whole site to balance the cut and fill of every pad and ramp.

Balance levels moves the chosen pads and ramps up or down together until cut minus fill is as close to 0 as it can get. Either choice only moves the pads and ramps you chose.

Minimise earthworks

Minimise earthworks finds the levels with the least digging and filling in total. It sets each chosen pad's and ramp's level on its own, aiming for the smallest cut plus fill. Use it when you pay for every cubic meter you move.

  1. Select the rows of the pads and ramps you want to move. To move one, skip this step.

  2. Right-click one of the rows and point to Minimise earthworks.

  3. Choose For this pad or For these pads to count their own cut and fill, or For the whole site to count the cut and fill of every pad and ramp.

While Giraffe works out new levels, the level options in the menu are greyed out.

Reset a pad to the ground

Right-click a pad's row in the Volumes table and choose Reset level. Giraffe sets each pad to the ground level at its middle, and each ramp to the ground level at its start.

Remove a pad from cut and fill

Right-click a pad's row in the Volumes table and choose Remove from cut and fill. Giraffe turns off the geometry's Cut and Fill property. The geometry stays on the map, and the ground under it goes back to its natural shape.

Find a pad on the map

Right-click a pad's row in the Volumes table and choose Fly to to move the map to it, or Select to select it.

Compare grading options on layers

Test different grading options by putting each option's pads and ramps on its own drawing layer. The Terrain app only counts pads and ramps on visible layers, so show one option's layer at a time to see the ground and the cut and fill for that option.

  1. Create a drawing layer for each option, such as "Option A" and "Option B".

  2. Draw each option's pads and ramps on its layer, or move them to it.

  3. In the Layer Palette, hide every option's layer except the one you want to see.

  4. Read the Volumes table and the Total row for that option.

Show one option at a time. Pads and ramps that overlap grade the same ground, so two options shown together give volumes that match neither option.

Balance levels and Minimise earthworks also count only the pads and ramps on visible layers. For them, For the whole site means every pad and ramp on a visible layer.

Use cut and fill in Analytics

Cut and fill is more than earth. It is a cost on your project. Use Analytics to put the volumes in your cost analysis.

Each pad and ramp stores its volumes as properties. Find them by searching the Property dropdown in Components:

  • cut: the earth dug out, as a positive number.

  • fill: the earth added, as a positive number.

  • cutAndFill: the net, which is fill minus cut.

Multiply a volume by a rate to create a site works cost calculation.