Skip to main content

Timeline

How to use the Timeline to view 4D construction sequences in AR

J
Written by Jovan Harrod
Updated over 7 months ago

AR Views can include a date range (Tobe Builder Pro license required). This will export the BIM links, Resources and Paths for the selected date range allowing the user to visualize a 4D construction sequence at the construction location.

AR Views that include time data will load with the timeline UI enabled. The timeline enables navigation through time.

Play button

Press the Play button to play the 4D sequence at the currently selected playback speed.
​

Time pick

Press hold and drag the time pick to navigate through time.

Timeline Settings button

Press the Timeline Setting button to open the Time Setting panel.

Playback speed dropdown

Press the dropdown to reveal the options including:

Realtime, Minutes/s, Hours/s, Days/s, Weeks/s, Months/s

BIM Links Toggle

BIM visibility is controlled by the timeline when BIM links are on

Resources Toggle

Resource visibility is controlled by the timeline when this is toggled on

Paths Toggle

Repeat Toggle

Did this answer your question?