AR Views can include a date range (Tobe Builder Pro license required). This will export the BIM links, Resources and Paths for the selected date range allowing the user to visualize a 4D construction sequence at the construction location.
AR Views that include time data will load with the timeline UI enabled. The timeline enables navigation through time.
Play button Press the Play button to play the 4D sequence at the currently selected playback speed.
|
|
Time pick Press hold and drag the time pick to navigate through time.
|
|
Timeline Settings button Press the Timeline Setting button to open the Time Setting panel. |
|
Playback speed dropdown Press the dropdown to reveal the options including: Realtime, Minutes/s, Hours/s, Days/s, Weeks/s, Months/s |
|
BIM Links Toggle BIM visibility is controlled by the timeline when BIM links are on |
|
Resources Toggle Resource visibility is controlled by the timeline when this is toggled on |
|
Paths Toggle
|
|
Repeat Toggle |
|