Why This Matters
With this setting for standard savings, you can define default rates by state so every proposal starts with the right baseline. This keeps your numbers consistent, saves time, and makes your savings estimates more reliable from the start.
What You'll Need
Admin access to SubcontractorHub Platform.
Step-by-Step Instructions
Step 1
Click “Settings” from the main menu.
Step 2
Scroll to find “Proposal Settings”.
Step 3
Click the “Edit” icon.
Step 4
Locate “Standard Savings Default” and turn the toggle on.
Step 5
Once the toggle has been switched on, a dropdown appears listing all the states. You can select the preferred state from the list.
Step 6
Scroll back up and click “Update” to save the changes.
Pro Tips
💡 Pro tip: Bookmark this page for quick reference when you need a refresher.
📱 Works on mobile: Access this feature from your phone or tablet when you're in the field.
🔄 Automate when possible: Pair this feature with automations to reduce manual work.
Troubleshooting
Problem | Solution |
I don't see this option | Make sure you have Admin access. Some features require specific permissions. |
Changes aren't saving | Try refreshing your browser and make sure you clicked Save before navigating away. |
Something looks different from the screenshots | SubcontractorHub updates regularly. The feature works the same way — the layout may just look slightly different. |
Last updated: 2026-08-28 · Source: How to Add Default Standard Savings Button to a Proposal?