How To Set Up Stakt Integration Settings

Why This Matters

BOM (Bill of Materials) settings control how your material lists are generated. Getting these right means accurate orders and fewer surprises on installation day.

What You'll Need

  • Admin access to SubcontractorHub

  • A web browser (Chrome or Edge recommended)

Step-by-Step Instructions

Step 1

Step 1: Set Up Bom Settings

Step 2

Step 2: Set Up Bom Settings

Step 3

Step 3: Set Up Bom Settings

Pro Tips

  • 💡 Stay on top of things: Check your project dashboard at the start of each day to see what needs attention.

  • 📋 Document everything: Add notes and photos as you go — future you will thank present you.

  • 🔄 Automate when possible: Pair this feature with automations to save even more time.

  • 📦 BOM tip: Always review your BOM before submitting orders to catch any sizing errors.

Troubleshooting

Problem

Solution

I don't see this option

Make sure you have Admin access. Some features require specific permissions.

Changes aren't saving

Try refreshing your browser and make sure you clicked Save before navigating away.

Something looks different from the screenshots

SubcontractorHub updates regularly. The feature works the same way — the layout may just look slightly different.

BOM isn't generating

Check that all required fields (panel type, quantity, roof type) are filled in before generating.