Why This Matters
Solar panel and design settings directly impact your proposals and project accuracy. Setting defaults correctly saves your team time on every new proposal and reduces errors in the field.
What You'll Need
Admin access to SubcontractorHub
A web browser (Chrome or Edge recommended)
Step-by-Step Instructions
Step 1
From the main menu, click your organization’s profile and select “Settings”.
Step 2
Go to “AI Tool Settings” and click on the “Edit” icon.
Step 3
Enable the “Show Lidar Date” setting, then click “Update”.You will now see the solar data collection date within the AI-Assisted solar design tool. This date is available only forDefaultandDefault (blank)design modes. Related ArticlesHow to Adjust AI-Assisted Design Tool Flow SettingsHow to Design Proposals with AIHow to Adjust Panel Orientation in the AI-Assisted Design ToolHow to Design Flat Roof and Ground Mount Solar Layouts with the AI-Assisted Design ToolHow to Enable LiDAR Data Collection Date in the AI-Assisted Tool
Real-World Example
💡 A home services contractor uses this feature to keep their daily operations running smoothly — saving time on every project and reducing manual errors for the whole team.
Pro Tips
Start small: Test this feature on one project before rolling it out company-wide.
Need help? Contact SubcontractorHub support — they're always happy to walk you through it.
Bookmark this guide: Come back anytime you need a quick refresher.
Troubleshooting
Problem | Solution |
Setting doesn't appear | Make sure you have admin access and the correct permissions enabled. |
Changes not saving | Refresh your browser and try again. Check your internet connection. |
Feature not working as expected | Clear your browser cache or try a different browser. Contact support if the issue persists. |
Change Log
Date | Change |
May 2026 | Rewritten for clarity; simplified language for non-technical contractors; added images and troubleshooting. |



