Why This Matters
Battery configurations are a growing part of solar and energy storage proposals. Getting these settings right means your proposals accurately reflect what your customers need — and your team doesn't have to chase down details later. This quick setup ensures everything flows smoothly from proposal to install.
What You'll Need
Admin access to SubcontractorHub
A web browser (Chrome or Edge recommended)
Step-by-Step Instructions
Step 1
From the main menu, click your organization’s profile and select“Settings”.
Step 2
Go to the “Public Proposal” section and click the“Edit” icon.
Step 3
Disable the“Show Post Utility Cost On Battery” setting.
Step 4
Click“Update” to save your changes. Related ArticlesHow to Set Up Commissions for the Solar + Battery Job TypeHow to Add a Battery MarginWhat Does a Public Proposal Contain?How to Hide System Losses From the Solar Details Section of ProposalsHow to Enable Additional Batteries in Solar and Battery Proposals
Real-World Example
💡 A solar installer enables additional battery options so their sales team can offer backup power packages to homeowners worried about outages — resulting in a 15% increase in average deal size.
Pro Tips
Start small: Test this feature on one project before rolling it out company-wide.
Need help? Contact SubcontractorHub support — they're always happy to walk you through it.
Bookmark this guide: Come back anytime you need a quick refresher.
Troubleshooting
Problem | Solution |
Setting doesn't appear | Make sure you have admin access and the correct permissions enabled. |
Changes not saving | Refresh your browser and try again. Check your internet connection. |
Feature not working as expected | Clear your browser cache or try a different browser. Contact support if the issue persists. |
Change Log
Date | Change |
May 2026 | Rewritten for clarity; simplified language for non-technical contractors; added images and troubleshooting. |



